  1. In less than 60 days from intimation from NTPC, Aqua commissioned 1250 m3/hr x 100m 600hp SubCF Pumps mounted on the Pontoons.
  2. 415mld Water Storage (Balancing) Reservoir is based on Aqua's SubCF Pumps (2880m3/hr each).
  3. Aqua’s HT SubCF Pumpsets of 850hp, 6600V are used by m/s. KBJNL at Tidagundi Branch Canal under Mulwad LIS.
  4. M/s NTPC's (3 x 660MW) North Karanpura STPP uses Aqua's SubCF (3000 m3/hr each) for Raw Water Intake.